Commercial Kitchens
All commercial kitchens have a testing and tagging & Residual Current Device (RCD) testing requirement for electrical equipment under AS/NZS 3760:2010.
On this page you will find all the information that you need to know, to ensure that your site is compliant with the appropriate regulations.
In Commercial Kitchens in Australia a 6 monthly for portable equipment & 12 monthly for fixed non-portable equipment for all electrical testing and tagging is required to meet the AS/NZS 3760:2010 standard.
A Commercial Kitchen would be classified as ‘open to abuse’ or a ‘Hostile Environment’.

”What
6 Monthly Testing Required
- Scales
- Blast Chiller
- Mixer
- Blender
- Frying Pan
- Deep Fryer
- Meat Slicer
- Coffee Machine
- Microwave
- Mincer
- Sandwich Press
- Fridge
- Freezer
- Oven
- Mixers
- Slicer
- Electric Knife
- Toaster
- Single & 3 phase portable plug in electrical equipment
- Portable equipment, hand-held equipment and stationary equipment,
designed for connection to the low voltage supply by a supply cord for
insertion into a socket outlet. - Cord sets, cord extension sets and outlet devices (also known as electrical portable equipment)
- Flexible cords connected to fixed equipment in hostile environments
- Portable power supplies including power adaptor packs, both safety
isolating and switch mode type transformers - Battery chargers including those for commercial or industrial use
- Portable & non portable equipment such as mixers, ovens, fridges etc.
Electrical equipment installed at a height of 2.5m, or greater above the ground, do not need to be tested under the AS/NZS 3760:2010 standard, this is where there is not a reasonable chance of a person touching the electrical equipment.
In order to remain compliant to the standard you will need to adhere to the
6 monthly cycle, as stated in the section above.
There is a tolerance of 2 weeks allowed from renewal date for you to still achieve compliance.
One of the most common problems that we see in the hospitality industry,
is that everyone is busy and it’s very easy to miss these dates and not be
compliant with the standards. We can help you by taking care of this
responsibility for you. Our staff can contact your manager several weeks
before your testing is due. With this we can arrange a time for a site visit to re-test and tag all your equipment and provide you with your compliance
reporting. This will enable you to get on with running your business hassle free.